Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the spacious domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/technoenergy/public_html/wp-includes/functions.php on line 6121
PIF Instalatie Fotovoltaica - TechnoEnergy

PART 1 – Design Verification

Design Verification is performed by the Employer and/or the Independent Third Party, and consists of the specific verifications set out in the table below.

PARTEA 1 – Verificarea Proiectului

Verificarea Proiectului este efectuată de către Angajator și/sau Terțul Independent și constă în verificările specifice prezentate în tabelul de mai jos.


D1 Implantation schematic / Technical drawing

Technical drawing of the site with:
• Unambiguous labelling of strings, arrays and inverters.
• Localization of wiring, junction boxes, inverters, substation, grid connections, obstacles.

D1 Schema de implementare / Desen tehnic

Proiectul tehnic al site-ului cu:
• Etichetarea fără ambiguitate a șirurilor, zonelor de stringuri și invertoarelor.
• Localizarea cablurilor, cutiilor de joncțiune, invertoare, substație, conexiuni la rețea, obstacole.

Forma 1